In successful cooperation with
Case Study – Regensburg city 2022
Extended modernization of traffic signals in the Regensburg urban area
D.-Martin-Luther-Str. 3 93047 Regensburg
Renewal of the control unit technology and parts of the outdoor installation. Conversion of all 9 traffic signal systems to LED technology. The construction measure is still to be completed by the end of 2022.